Navy plans need to allow enough time to demonstrate capability of first Littoral Combat Ships

gao.gov
Visit Site

GAO report recommends that selection of a Flight 1 design be delayed until after experiments with the Flight 0 prototypes.

Visits
189
Added
Mar 29, 2025
Rating
(127)
Rate This Site
QR Code
QR code Download PNG
Embed Badge
Place this code on your website to show you're listed here.
Get the best links delivered weekly — hand-picked from 1,200,810 resources